Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt et.
This beautiful addition to the Oregon State campus was completed in 2011. J&S’ scope included the structural elements of the building – the brick façade sits on a structural CMU substrate. In addition to the 85,000 brick and the over 20,000 CMU, J&S was responsible for furnishing and installing the precast concrete architectural elements, and the structural metal ledger angles for the brick veneer.
Corvallis, OR
THA Architecture
Hoffman Construction
2631 SW Campus Way, Corvallis, OR 97331